Version
Screen:
PP0000009
The version is the link
between a product BOM (Bill of Material) and the process Routing. It determines
which Version BOM is used together with which routing to produce a material or
plan a material.
There may be different
production versions based on the lot sizes and validity dates.
Title Bar
The title bar includes
standard buttons and buttons that are specific to this form. For the list of standard
buttons Includes Add, Edit, Delete and View the data which are described below
|
Button |
Description |
|
Add |
Create new Version |
|
Edit |
Edit and
update Version |
|
Delete |
Delete Version |
|
View |
View existing Version |
|
Export |
Export Version
to Excel file |
|
Import |
Import New Version
by Excel file |
Table
This table lists all the General configured parameter in the system.
|
Column |
Description |
|
Product
Version |
Specify
Version which determines the various production techniques according to which
a material can be manufactured. |
|
Branch |
Specify
uniquely identifying a branch where version is used |
|
Description |
Version
Description |
|
Min
Qty |
Lowest
limit of the lot-size interval. The version is valid from this limit. |
|
Max
Qty |
Uppermost
limit of the lot-size interval. The version is valid up to this limit. |
|
Valid
From |
Version
can use from date. |
|
Valid
To |
Version
can use until date. |
|
Routing |
Assign
Routing to version. |
|
BOM |
Assign
BOM to version. |
|
BOM
Version |
Assign
Version BOM to Version |