Logo

Version

Screen:  PP0000009

The version is the link between a product BOM (Bill of Material) and the process Routing. It determines which Version BOM is used together with which routing to produce a material or plan a material.

There may be different production versions based on the lot sizes and validity dates.

Title Bar

The title bar includes standard buttons and buttons that are specific to this form. For the list of standard buttons Includes Add, Edit, Delete and View the data which are described below

Button

Description

Add

Create new Version

Edit

Edit and update Version

Delete

Delete Version

View

View existing Version

Export

Export Version to Excel file

Import

Import New Version by Excel file

 

 Table 

This table lists all the General configured parameter in the system.

Column

Description

Product Version

Specify Version which determines the various production techniques according to which a material can be manufactured.

Branch

Specify uniquely identifying a branch where version is used

Description

Version Description

Min Qty

Lowest limit of the lot-size interval. The  version is valid from this limit.

Max Qty

Uppermost limit of the lot-size interval. The version is valid up to this limit.

Valid From

Version can use from date.

Valid To

Version can use until date.

Routing

Assign Routing to version.

BOM

Assign BOM to version.

BOM Version

Assign Version BOM to Version

 

Helper Cuscen