Logo

Material Requirement Planning (MRP)

Screen:  PP0000018

The Material Requirement Planning is used to procure or produce the required material quantities on time for in-house purpose or for fulfilling customer demands. In manufacturing, the function of MRP is to guarantee material availability on time. The main objective is to plan the supply based on requirements and considering the current stock in hand and meet the shortages.

Title Bar

The title bar includes standard buttons and buttons that are specific to this form. For the list of standard buttons Includes Back, and Run the data which are described below

Button

Description

Back

Back to  

Run

Execute MPR

 

Table  

This table lists all the MRP configured parameter in the system.

Column

Description

Branch

Specify uniquely identifying a branch where MRP will be run

Material Code

Specify Material Code will be run

MRP Control

Select MRP control

MRP Group

Select MRP group

Run Date

Choosing running date

Planned Mode

Select planned mode weather Add New Planning or Delete and Re-Create Planning

List

Material list will be displayed Summary

Detail

Material list will be displayed Detail

 

Helper Cuscen